Tracking progress with a project log

Tip: Choose Save as PDF in the print dialog to download. Use A4 paper size.

Tracking progress with a project log

Name:
Date:
Class:

Quick Questions

Shade in the A or B circle for each question.

1. Which entry is the better project log entry for a work session?
A 12 May: Built the login page. Problem: button did not submit. Next: fix the form code.
B Did some work on the app today and it went fine.
2. What should every project log entry start with?
A The final grade you hope to get
B The date of the work session
3. You hit a bug during a session. What should the log show?
A The problem and how you fixed it (or what you will try next)
B Nothing, because logs only record things that went well
4. Your Gantt chart said the database would be finished by 20 May, but your log shows it was finished on 27 May. What does the log show?
A Actual progress was ahead of the planned progress
B Actual progress was behind the planned progress
5. Your team changed the plan because the chosen app tool was too hard to use. Where is the best place to evidence why?
A In a dated project log entry that explains the problem and the change
B Nowhere, because the plan only needs to show the final version

Match the Pairs

Draw a line connecting each item on the left to its match on the right.

Left columnRight column
112 Aug: Built login page. Problem: button did not work. Fix: renamed the ID. Next: test with users. AThe log ignores a problem. Actual progress is behind the plan but no problem or reason for the delay is recorded.
2Planned: 5 tasks done. Actual: 3 done. Reason: testing took longer. BProblem: images loaded slowly. Fix: compressed the files. Plan: add 1 day for testing.
3Dated entries let you see when work happened and in what order CA complete project log entry with the date, what was done, a problem and its fix, and the next step
4Recording a problem and its fix shows how you solved issues and why the plan changed DLog entry - Tue 3 Sep: Wrote the survey questions.
5Log entry: Worked on the app. Next: keep going. EComparing actual progress with the plan and recording why they differ
6Week 4: Everything went fine. (Actual progress: 2 of 6 tasks, planned: 6 of 6) FThere is no date, no detail about what was done, and the next step is vague.

Definitions

project log

Fill in the Blanks

Complete each line of code by filling in the missing parts.

1.
____: 12 March Done: Drew the app wireframes Next step: Build the login page
2.
Date: 14 March _______: Login button did not work Fix: Renamed the button ID
3.
Date: 19 March Done: Tested the quiz screen _________: Fix the scoring bug
4.
Planned: 5 tasks done by Friday ______: 3 tasks done Change: Move testing to Week 4
5.
Planned: 5 tasks Actual: 3 tasks Tasks behind: _

Spot the Error

Shade in the letter of the line that contains an error.

Question 1
A Date: 12 May
B Done: Wrote survey questions
C Problem: stuff went wrong
D Next: Fix the submit button
Question 2
A Date: 14 May
B Planned: Finish menu page
C Actual: Finished half of it
D Next: Nothing, I am done
Question 3
A Date: sometime this week
B Done: Drew app wireframes
C Problem: Colours hard to read
D Next: Test new colour pairs
Question 4
A Date: 21 May
B Done: Coded the quiz scoring
C Problem: Score showed NaN
D Fix: Nothing, ignored it
Question 5
A Date: 26 May
B Done: Will test game levels
C Problem: Level 3 too hard
D Next: Lower enemy speed

Answer Key

Tracking progress with a project log
Section A: Quick Questions
Q1
A — 12 May: Built the login page. Problem: button did not submit. Next: fix the form code.
Q2
B — The date of the work session
Q3
A — The problem and how you fixed it (or what you will try next)
Q4
B — Actual progress was behind the planned progress
Q5
A — In a dated project log entry that explains the problem and the change
Section B: Match the Pairs
Q1
12 Aug: Built login page. Problem: button did not work. Fix: renamed the ID. Next: test with users. → A complete project log entry with the date, what was done, a problem and its fix, and the next step
Q2
Planned: 5 tasks done. Actual: 3 done. Reason: testing took longer. → Comparing actual progress with the plan and recording why they differ
Q3
Dated entries let you see when work happened and in what order → Log entry - Tue 3 Sep: Wrote the survey questions.
Q4
Recording a problem and its fix shows how you solved issues and why the plan changed → Problem: images loaded slowly. Fix: compressed the files. Plan: add 1 day for testing.
Q5
Log entry: Worked on the app. Next: keep going. → There is no date, no detail about what was done, and the next step is vague.
Q6
Week 4: Everything went fine. (Actual progress: 2 of 6 tasks, planned: 6 of 6) → The log ignores a problem. Actual progress is behind the plan but no problem or reason for the delay is recorded.
Section C: Definitions
Q1
project log — A record of each work session: the date, what was done, any problems and the next step. It shows actual progress against the plan and evidences why the plan changed.
Section D: Fill in the Blanks
Q1
Date: 12 March Done: Drew the app wireframes Next step: Build the login page
Q2
Date: 14 March Problem: Login button did not work Fix: Renamed the button ID
Q3
Date: 19 March Done: Tested the quiz screen Next step: Fix the scoring bug
Q4
Planned: 5 tasks done by Friday Actual: 3 tasks done Change: Move testing to Week 4
Q5
Planned: 5 tasks Actual: 3 tasks Tasks behind: 2
Section E: Spot the Error
Q1
C — A log problem must say exactly what went wrong so it can be fixed and evidenced. It should be specific, like 'Problem: Form would not submit'.
Q2
D — The Actual line says only half the menu is finished, so the next step must be to finish the rest. It should be 'Next: Finish rest of menu'.
Q3
A — Each log entry needs an exact date so progress can be tracked and checked later. It should be a specific date like 'Date: 19 May 2025'.
Q4
D — A fix must record what was actually done to solve the problem. Ignoring it leaves no evidence of a solution. It should be something like 'Fix: Changed text to number'.
Q5
B — 'Done' records work already completed in the session, so it must be in the past tense. It should be 'Done: Tested the game levels'.