Tip: Choose Save as PDF in the print dialog to download. Use A4 paper size.
Shade in the A or B circle for each question.
Draw a line connecting each item on the left to its match on the right.
| Left column | Right column | |
|---|---|---|
| 1restoration | Arestore_order = ["payment system", "customer database", "staff intranet"] | |
| 2RTO = 4 hours | BThe ordered process of bringing systems and data back into use from backups after a disruption | |
| 3Restore the most critical systems first, then less important ones | CRecovery point objective is mixed up with backup frequency. The RPO is the maximum data loss allowed, so frequent backups mean a small RPO, such as 15 minutes, not 24 hours. | |
| 4Check the restored data is correct and complete before returning to normal use | DRecovery time objective: the longest acceptable time to get a system working again after a disruption | |
| 5RPO = 24 hours (backups taken every 15 minutes) | Everify(restored_data, backup_checksum) | |
| 6restore(all_systems); verify(); restore(payment_system) | FThe critical payment system is restored last and verification happens too early. Critical systems should be restored first and data checked after restoring. |
Complete each line of code by filling in the missing parts.
Shade in the letter of the line that contains an error.
restoration — The ordered process of bringing systems and data back into use from backups after a disruption, restoring critical systems first and then checking the restored data is correct and complete.RESTORE payrollDB FROM latestBackupRESTORE critical systems FIRST
RESTORE other systems NEXT
VERIFY restored dataIF restoreHours <= RTO THEN
PRINT "Within recovery time"
END IFIF hoursSinceBackup <= RPO THEN
PRINT "Data loss acceptable"
END IFIF HASH(restoredData) = backupHash THEN
PRINT "Restored data verified"
END IF