Shade in the A or B circle for each question.
Draw a line connecting each item on the left to its match on the right.
| Left column | Right column | |
|---|---|---|
| 1Finish: planned 12 Sep -> actual 19 Sep | AThe subtraction is the wrong way round. It gives a negative number when the project finishes late. | |
| 2Scope: 5 charts planned -> 4 delivered | BThis is a vague judgement with no evidence. It does not mention the delay, dropped features or extra effort. | |
| 3A change can add extra effort even if the finish date stays the same, so effort is part of its impact | CEffort: planned 10 h -> actual 16 h (+6 h) | |
| 4An effectiveness judgement states the impact and backs it with evidence about delay and dropped features | DChange caused a 3 day delay and dropped the map chart, so the solution was less effective. | |
| 5Impact: the change was fine. | EOne feature was dropped, so the scope of the finished solution was reduced. | |
| 6Delay = planned finish - actual finish | FThe change caused a 7 day delay to completion, because the finish date moved later. |
Complete each line of code by filling in the missing parts.
Shade in the letter of the line that contains an error.
Impact of a change — How much a change affected the finish date, the scope and the quality of the finished solution, such as delay, dropped features and extra effort.delay = actualFinish - plannedFinish=IF(D2>C2,"Delayed","On time")=COUNTIF(B2:B9,"Dropped")=SUM(C2:C9)-SUM(B2:B9)IF delay > 5 THEN
OUTPUT "High impact on finish date"
ENDIF