Tip: Choose Save as PDF in the print dialog to download. Use A4 paper size.
Shade in the A or B circle for each question.
Draw a line connecting each item on the left to its match on the right.
| Left column | Right column | |
|---|---|---|
| 1representative chart | AA check that the total of the source table equals the total shown in the chart's data, to confirm the totals add up | |
| 2=SUM(B2:B6)=SUM(C2:C6) | BThe chart type does not suit the data. A pie chart shows parts of a whole, so a line or column chart should be used to show change over time. | |
| 3Check that the chart's axis starts at zero so bar lengths are not exaggerated | CAxis minimum = 0 | |
| 4Compare each plotted value with its matching cell in the source table | D=B3=D3 | |
| 5Source total = 250, chart bars add up to 310 | EThe totals do not match, so a value has been plotted wrongly, doubled or added by mistake. Check each bar against the table and correct it. | |
| 6Pie chart used to show daily temperatures across 30 days | FA chart whose plotted values, axis scales and categories all match the source data, so it shows the data truthfully |
Complete each line of code by filling in the missing parts.
Shade in the letter of the line that contains an error.
representative chart — A chart whose plotted values, axis scales and categories all match the source data, so it shows the data truthfully and does not mislead the viewer.=SUM(B2:B9)=MAX(B2:B9)=COUNT(B2:B9)=IF(SUM(B2:B9)=SUM(C2:C9),"Match","Check")=MIN(B2:B9)