Tip: Choose Save as PDF in the print dialog to download. Use A4 paper size.
Shade in the A or B circle for each question.
Draw a line connecting each item on the left to its match on the right.
| Left column | Right column | |
|---|---|---|
| 1Change the chart to a line chart. | AA follow-up prompt that changes the chart type to suit the data | |
| 2Label the y-axis 'Rainfall (mm)' and add a chart title. | BA follow-up prompt that fixes labels and the title | |
| 3Refining a prompt by adding detail after reviewing the chart | CPrompt 1 > check chart > Prompt 2 > check chart > Prompt 3 | |
| 4Iterating: send a follow-up, check the new chart, then repeat until it is right | DToo vague. It does not name what to change, so the AI has to guess. | |
| 5Make it better. | EThis skips reviewing the chart and throws away what already works instead of naming what to change. | |
| 6Ignore the chart and write a whole new prompt from scratch every time. | FAdd data labels to each column and show only Year 12 results. |
Complete each line of code by filling in the missing parts.
Shade in the letter of the line that contains an error.
Refining a prompt — Reviewing the AI's chart, then sending a follow-up prompt that names exactly what to change, such as labels, chart type or detail, and repeating until it is right.Compare 8 classes: the pie is too crowded.
Change the pie chart to a bar chart.Problem: months are shown, but no label.
Follow-up: add an x-axis label 'Month'.Bars show sales, but no values are visible.
Add data labels to the top of each bar.Review the chart, send a follow-up, then
repeat.Show how study hours relate to test marks.
Change the line chart to a scatter chart.