Tip: Choose Save as PDF in the print dialog to download. Use A4 paper size.
Shade in the A or B circle for each question.
Draw a line connecting each item on the left to its match on the right.
| Left column | Right column | |
|---|---|---|
| 1Rounded rectangle (terminator) containing START | AInput must be drawn in a parallelogram, not a rectangle. The rectangle is the process symbol, so the wrong symbol has been used. | |
| 2Diamond containing Mark >= 50 ? | BMarks the start of the flowchart. A terminator is also used with END to mark where it finishes. | |
| 3A parallelogram is the input/output symbol, used when data goes in or comes out | CA decision symbol: it asks a question and has two exits labelled Yes and No (or True and False). | |
| 4A rectangle is the process symbol, used for a calculation or an assignment | DRectangle containing Total ← Total + Mark | |
| 5A rectangle containing the text INPUT Name | ESTART and END must be in a terminator, a rounded rectangle. A circle is not one of the six standard symbols, so it is not allowed. | |
| 6A circle containing the text START | FParallelogram containing INPUT Age |
Complete each line of code by filling in the missing parts.
Shade in the letter of the line that contains an error.
flowchart symbols — Cambridge 0478 flowcharts use only six standard shapes: terminator, process, input/output, decision, subroutine and flow line. Each shape must be drawn correctly and used for its own job.Diamond shape = decision symbolParallelogram = input/output symbolRounded box for START and END = terminatorRectangle with double sides: subroutineRectangle for Total ← Total + 1: process