Tip: Choose Save as PDF in the print dialog to download. Use A4 paper size.
Shade in the A or B circle for each question.
Draw a line connecting each item on the left to its match on the right.
| Left column | Right column | |
|---|---|---|
| 1Risk: Teammate sick on due date | AThis is not a risk because it names no specific thing that might go wrong. Teams need to identify time, technical or team risks. | |
| 2Risk: Laptop crashes, files lost | BRisk log (week 1): Wi-Fi may drop during upload | |
| 3A time risk is something that could make the project run late, so it is listed before the deadline arrives | CRisk: Testing may take longer than planned | |
| 4A risk is something that might happen, so it is written down before it occurs rather than after | DA team risk: a member being absent could leave a task unfinished | |
| 5Risk: Our app crashed yesterday and we lost our work | EThis describes a problem that has already happened, not a risk. A risk is something that might go wrong and is listed before it happens. | |
| 6Risk: Nothing will go wrong with our project | FA technical risk: a tool failing or data being lost could stop the project |
Complete each line of code by filling in the missing parts.
Shade in the letter of the line that contains an error.
project risk — Something that might go wrong and harm a project plan, such as a late deadline, a tool failing or a team member being absent. Risks are listed before they happen.Risk: Deadline is missed
Type: timeRisk: Laptop crashes and files are lost
Type: technicalRisk: Team member is away sick
Type: teamrisks ← []
ADD "Wi-Fi outage" TO risksRisk: Tool stops working
Status: listed before it happens