Tip: Choose Save as PDF in the print dialog to download. Use A4 paper size.
Shade in the A or B circle for each question.
Draw a line connecting each item on the left to its match on the right.
| Left column | Right column | |
|---|---|---|
| 1Right-click chart > Change Chart Type | AOpens the menu where you pick a different chart type for the chart you already made | |
| 2Change Chart Type > Line | BChange Chart Type > Line (for Jan to Dec temperatures) | |
| 3To compare how two chart types show the same data, switch the chart type and keep the data | CThis wastes time because Change Chart Type switches the chart to a line chart using the same data. | |
| 4Some data suits one chart type better, such as monthly temperatures on a line chart | DTurns a column chart into a line chart using the same data, with no retyping | |
| 5Delete the chart and type all the data again to make it a line chart | EA pie chart does not suit data over time or with many values; a line or column chart would be a better choice. | |
| 6Change Chart Type > Pie (for 12 months of temperatures) | FRight-click > Change Chart Type > Column, then Line |
Complete each line of code by filling in the missing parts.
Shade in the letter of the line that contains an error.
Change Chart Type — A chart option (right-click the chart) that switches it to another type, like column to line, using the same data so you do not have to enter it again.Right-click the chart
Then choose Change Chart TypeRight-click the chart > Change Chart TypeOver time: Change Chart Type > LineRight-click chart > Change Chart Type
Choose Pie only for parts of a wholeChart 1: Column of A1:B6
Change Chart Type > Line
Chart 2: Line of A1:B6